







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHome Additions & ADU Near You in Lancaster, CA
A home addition or ADU in Lancaster typically costs between $95,000 and $220,000 for a full build, and between $180 and $310 per square foot for a permitted addition finished to code. Rowan Construction Group delivers a written flat price with a written scope before any work begins, so you know the number before a shovel turns. Call (844) 797-3312 and a live person answers, day or night. We work with homeowners across Lancaster, Palmdale, Sun Village, Lake Los Angeles, and the Pasadena foothill communities.
You’re searching “near me” because you’re ready to move. The house is too small, the in-laws need their own entrance, or you’ve got a garage that’s doing nothing but holding boxes. Here’s what you can actually count on: a written price before anyone lifts a tool, a signed change order for every adjustment, and a documented photo record from every visit. That’s Clause 1 of the Haven Standard, and it’s the reason our projects land within a few percent of the number the customer agreed to.
Key Takeaways
- Lancaster additions run roughly $95,000 to $220,000 depending on size, foundation, and finish level.
- ADUs (accessory dwelling units) are a separate category with their own permit path in LA County.
- Every Rowan project carries a flat written price, a written scope, and a signed change order for any change.
- Our technicians have up to 19 years of experience, and crews are background-checked and uniformed.
- 365-Day Done Right Promise backs every job, printed on the page, not hidden in an asterisk.

Fast, Local Home Additions & ADU
When you call (844) 797-3312, you reach a live person, not a voicemail tree. For an addition or ADU, though, “same day” isn’t how the build works: we schedule a site visit within a few business days of your call so a technician can walk the lot, check setbacks and utilities, and talk through the number. The visit itself gives you a documented photo record of what we find, from the foundation conditions to the existing roofline and how the new structure will tie in.
What we’re looking at in Lancaster specifically matters. Our technicians have up to 19 years of experience and know this Antelope Valley terrain. That means clay-heavy soils that shift with the wet-dry cycle, high desert wind exposure that stresses any new roof-to-wall connection, and big temperature swings that have to be accounted for in the slab and framing plan. We put all of that into the written scope before the first permit is filed, not after.
We serve Lancaster and the surrounding communities, and every project comes with:
- A flat written price with a written scope, delivered before work starts.
- A free second opinion on any competitor’s written estimate: bring it in and we’ll review it line by line, no charge.
- Background-checked, uniformed technicians whose work is documented with photos on every visit.
- The 365-Day Done Right Promise: if it isn’t done right, we make it right, backed by The Haven Standard.
Areas We Cover
Rowan Construction Group handles home additions and ADUs across the Antelope Valley and into the San Gabriel foothills. If you’re in Lancaster or right next door in Palmdale, we’re close. We also work in Sun Village and Lake Los Angeles, where larger lots make an ADU or detached addition a real possibility, and down in Altadena, Pasadena, Sierra Madre, and Monrovia, where lot tightness and existing architecture drive a different kind of planning. Wherever you are, the answer is the same: a written price, a written scope, a documented record.
Lancaster’s zoning and the County’s ADU rules aren’t identical to what applies in Pasadena, and we plan the build around what your lot actually allows, not a generic template. If you want the full picture on the service itself, start with our Home Additions & ADU in Lancaster page, then call to schedule your site visit.

What a Home Addition or ADU Costs in Lancaster
Pricing here is driven by foundation, framing, utilities, tie-in to the existing structure, and finish level, not by a per-foot number on a flyer. The ranges below are what we work with in the Lancaster market. Every one of them gets a flat written price before we start.
| Project Type | Typical Range | What Drives the Number |
|---|---|---|
| Bump-out or small addition (150 – 300 sq ft) | $95,000 – $140,000 | Foundation depth, tie-in detail, window count |
| Mid-size addition (300 – 600 sq ft) | $140,000 – $190,000 | Framing, roofline, electrical and HVAC extension |
| Large addition (600+ sq ft) | $190,000 – $220,000+ | Slab, structural engineering, full finish package |
| Detached or attached ADU | $120,000 – $240,000 | Kitchen/bath count, utility trenching, parking |
| Garage conversion to ADU | $85,000 – $130,000 | Insulation, egress, kitchen and bath rough-in |
These aren’t teaser numbers. When you bring us a competitor’s written estimate, we’ll review it line by line at no charge as a free second opinion, so you can compare the scope behind the price, not just the price. That’s under Clause 1 of the Haven Standard: the number goes in writing first, then the tools come out.
Adding an ADU vs. an In-Law Suite: What’s the Difference?
An ADU is a separate, code-compliant dwelling unit with its own kitchen, bathroom, sleeping area, and entrance, whether attached to the main house or detached on the lot. An in-law suite is a set of rooms inside the main footprint that shares the kitchen and typically the entrance, so it usually doesn’t need the same utility separation or full permit path that a standalone ADU does. In Lancaster, the two have different permit requirements and different costs, and the lot size and setback rules decide which one your property can carry. We sort that out in the site visit, before any price is written.
FAQs
How fast can you start a home addition or ADU in Lancaster?
We schedule a site visit within a few business days of your call, and the written price follows once the site conditions are confirmed. Permitting and build time depend on the scope, and we lay those out in the written schedule before anything begins. Call (844) 797-3312 to get the site visit on the calendar.
Do you serve my area near Lancaster?
Yes, if you’re in Lancaster, Palmdale, Sun Village, Lake Los Angeles, Altadena, Pasadena, Sierra Madre, or Monrovia. Those are the communities we work in, and the written price and documented photo record apply everywhere. Call (844) 797-3312 to confirm coverage for your address.
How much does a home addition cost in Lancaster?
Most Lancaster additions land between $95,000 and $220,000 depending on square footage, foundation, and finishes, and an ADU typically runs $120,000 to $240,000. Those are ranges, and your flat written price gets set after the site visit and a written scope. Call (844) 797-3312 for a free estimate.
Can I reach someone after hours to talk about my project?
Yes. A live person answers calls 24/7, so you can reach us about an addition or ADU in Lancaster whenever it works for you. Call (844) 797-3312 and you’ll get a real answer, not a recording.
Get Your Written Price Before Work Starts
You’re ready because the space isn’t. Rowan Construction Group brings a flat written price, a written scope, a written warranty, and a documented photo record to every addition and ADU project in Lancaster. Bring a competitor’s written estimate and we’ll review it line by line at no charge. When you call, you’ll reach a live person who can get your site visit on the books. Call (844) 797-3312 for a free estimate.
Written by the team at Rowan Construction Group Lancaster, serving Lancaster and nearby areas.
What Our Customers Say
"Good communication throughout. Weekly written update meant I never had to chase them."
- Nadine G."Fence and retaining wall along a sloped boundary. They photographed the footing depth at each post, which mattered when the county inspector came."
- Iona F."Final invoice was within two percent of the contract. Every change was priced and signed before anyone picked up a tool."
- Malcolm T.












